Contributing Factors
Communication
- Refinery Hydrocracker Pipe Ruptures and Releases Explosive Mixture with Hydrogen (Added: 1/12/2010)
- Hydrogen Boosting Compressor Fails (Added: 2/25/2008)
- Liquid Hydrogen Refueling Operational Incident (Added: 1/29/2007)
- Pressure Reducing Clamp Removal Mishap (Added: 1/17/2007)
- Failure of Stainless Steel Valves due to Hydrogen Embrittlement (Added: 12/27/2006)
- Saltwell Pump May Have Been Operated While the Standard Hydrogen Monitoring System was Not in Operational Mode (Added: 8/7/2006)
- Combustible Gas Monitoring System in Furnace Room Found Inoperable (Added: 6/26/2006)
- Deviation from Work Plan Results in Cutting Pipe Prior to Second Explosive Gas Test (Added: 5/5/2006)

